Solar Orbiter (SoLo), part of the ESA/NASA “HORIZON 2000 +” programme
- Writing of the Spacecraft level EMC & Magnetic Test Specification in preparation for the Environmental test programme at IABG facilities
- Performing the Systems level EMC assessment and review of EMC Test Procedures/Reports, NCRs, RFDs and writing of the harness grounding methodology document for the spacecraft
HISPASAT (HAG-1) under the ESA ARTEMIS 11 strategy
We provided EMC design support for the HAG-1 Small Geo under the ESA ARTEMIS 11 strategy.
- The preparation of System, Sub-system and Equipment level EMC specification & analysis documentation
- Participation in Formal Design Reviews (PDR, CDR QR and FAR), Material Review Boards (MRB’s), Technical Requirements Reviews (TRR’s), Technical Review Boards (TRB’s) Video/Telecons & other Project related meetings
- Procedures/Reports, NCRs, RFDs and writing of the harness grounding methodology document for the spacecraft
The Huygens Probe for the Cassini Saturn Mission
The work entailed the Preparation of System, Sub-system and Equipment level EMC specification & analysis documentation and participation in Formal Design Reviews (PDR, CDR QR and FAR), Material Review Boards (MRB’s), Technical Requirements Reviews (TRR’s), Technical Review Boards (TRB’s) Video/Telecons & other Project related meetings.
- Responsibility for the (Prime) Systems level EMC Management & Control of the Huygens Probe.
- Liaison with the Prime’s Design engineers, ESA & NASA agencies with responsibility for the both EMC and Lightning requirements.
- Delivery of all relevant Prime EMC documentation for the Probe’s Electrical Platform Modules, Telecomms and Payload Instruments encompassing phase B through C/D FAR