EMC for Space

Solar Orbiter (SoLo), part of the ESA/NASA  “HORIZON 2000 +” programme

  • Writing of the Spacecraft level EMC & Magnetic Test Specification in preparation for the Environmental test programme at IABG facilities
  • Performing the Systems level EMC assessment and review of EMC Test Procedures/Reports, NCRs, RFDs and writing of the harness grounding methodology document for the spacecraft

 

HISPASAT (HAG-1) under the ESA ARTEMIS 11 strategy

We provided EMC design support for the HAG-1 Small Geo under the ESA ARTEMIS 11 strategy.

  • The preparation of System, Sub-system and Equipment level EMC specification & analysis documentation
  • Participation in Formal Design Reviews (PDR, CDR QR and FAR), Material Review Boards (MRB’s), Technical Requirements Reviews (TRR’s), Technical Review Boards (TRB’s) Video/Telecons & other Project related meetings
  • Procedures/Reports, NCRs, RFDs and writing of the harness grounding methodology document for the spacecraft

 

The Huygens Probe for the Cassini Saturn Mission

The work entailed the Preparation of System, Sub-system and Equipment level EMC specification & analysis documentation and participation in Formal Design Reviews (PDR, CDR QR and FAR), Material Review Boards (MRB’s), Technical Requirements Reviews (TRR’s), Technical Review Boards (TRB’s) Video/Telecons & other Project related meetings.

  • Responsibility for the (Prime) Systems level EMC Management & Control of the Huygens Probe.
  • Liaison with the Prime’s Design engineers, ESA & NASA agencies with responsibility for the both EMC and Lightning requirements.
  • Delivery of all relevant Prime EMC documentation for the Probe’s Electrical Platform Modules, Telecomms and Payload Instruments encompassing phase B through C/D FAR

Send us a quick message

To find out about how we process your data, please read our privacy policy.

Submit